LoadCalcs logoLOADCALCS

Permit requirements

Duval County (Jacksonville), FL HVAC permit requirements

What the adopted code says, what the permit office actually collects, and where each answer comes from.

Manual J / SVaries
Manual DVaries
Climate zone—
Verified2026-10-12

Who permits HVAC work in Duval County

Jacksonville and Duval County are one consolidated government, so one office handles building permits for the city and county. The office describes its job this way: ‘The Building Inspection Division is responsible for protecting the public health, safety and welfare through the enforcement of the Florida Building Code and the City of Jacksonville’s building ordinances.’

The division’s own forms are headed ‘City of Jacksonville - Department of Public Works’, with ‘Building Inspection Division’ beneath it. Whether any other incorporated community inside the county runs its own permit office is Not verified here.

Building Inspection Division home page New Building checklist (header)

Adopted code and effective date

Florida Building Code, 8th Edition (2023). The division’s home page says: ‘The current code in effect is the Florida Building Code 8th Edition (2023).’ On timing it says: ‘Documents for permits submitted on or after January 1, 2024 will need to reference and comply with the Florida Building Code 8th Edition (2023).’

Its FAQ lists what that includes: Florida Building Code, Building; Fuel Gas; Mechanical; Plumbing; Accessibility; Energy Conservation; and Existing Building. The prior edition’s local rules were not retrieved and are Not verified.

Building Inspection Division home page Building Inspection Division FAQs

Energy code and Form 405

For one- and two-family new buildings, the city’s checklist has a heading that reads: ‘Energy Form 402 & 405 - FBC Energy Conservation 101.5.1’. Under it the city asks the applicant to ‘Complete and provide form R402, R405, R406 or total UA, with required signatures.’ and ‘Complete the Energy Performance Level (EPL) display card.’

The checklist also gives the form-header number: ‘City of Jacksonville jurisdiction number is 261300’.

New Building – 1 & 2 Family Checklist (rev. 4/21/2026)

Load calculation (Manual J / S)

Required in the new-building package. This is one of the few jurisdictions we have read that writes the words. The same energy section of the checklist says: ‘Provide HVAC system sizing and selection (ACCA Manual S).’ and ‘Provide calculations, based on ACCA Manual J, 2023, 8th Edition minimum, FBC-Energy Conservation R403.’

It also sets an oversizing limit: ‘The equipment total cooling shall be within 100% to 115% of the project’s required cooling load. If the Manual J does not contain equipment information, provide an equipment summary sheet (manufacturer, tonnage, model number, total cooling, SEER; HSPF/AFUE, FBC-Energy R403).’

Scope matters. The checklist is titled for ‘One and Two Family New Buildings, Accessory Structures and Additions’. It is labelled ‘Resource only - This does not replace or limit compliance with the Florida Building Code or Local Ordinance.’

New Building – 1 & 2 Family Checklist (rev. 4/21/2026)

Duct design (Manual D)

Required in the same package. The checklist item reads: ‘Provide a duct supply, return air and air distribution design (ACCA Manual D), FBC-Energy Conservation R103.2; FBC-Mechanical 603-2.’

New Building – 1 & 2 Family Checklist (rev. 4/21/2026)

Replacements and changeouts

A permit is required for replacing air conditioning units. The city’s FAQ lists, under permit-required work: ‘Repairs – replacement of water heaters or other plumbing fixtures, irrigation systems, air conditioning units, new electrical service, rewiring, etc.’ The residential page lists what does not need one, under Mechanical: ‘Replacement of any part within a single piece of equipment’. Whole-unit replacement is not on that list.

The city also publishes an inspection waiver for like-for-like replacements. The form is titled ‘PROPERTY OWNER REQUEST FOR INSPECTION EXEMPTION FOR REPLACEMENT OF ONE- AND TWO-FAMILY HVAC EQUIPMENT’. It requires ‘a notarized property owner signature’, states ‘Total Cost:’ ‘(cannot exceed $5,000)’, and says the rule applies ‘for replacement of existing electric one- and two-family HVAC equipment only, when requested by the property owner.’ It also says ‘the Building Inspection Division reserves the right to deny this request.’ The form carries a ‘Permit Number’ field, so it waives inspections, not the permit.

Not verified: whether a changeout permit requires a submitted Manual J, S or D. The only Manual J checklist we found is the new-building one above, and we found no mechanical-replacement checklist on the forms page. Ask the division before assuming either way.

Building Inspection Division FAQs Residential permits page Inspection exemption form (rev. 3/26/2026) Checklists, forms and documents

How to submit

JaxEPICS only. The division states: ‘Online (electronic) permit submission is now required for all permit types.’ and ‘You must have a JaxEPICS account to submit for a permit.’ The portal is jaxepics.coj.net. ‘All documents submitted must be in PDF format.’

Review order is described this way: ‘Your plan review time frame does not start until Zoning, Concurrency, and Development Services have approved the plans for review and your plan review fee has been paid.’ The Notice of Commencement threshold on the new-building checklist is ‘A Notice of Commencement (NOC) form is required if the total job cost is more than $5,000.00.’ while the residential page says ‘When improvements exceed $5,000. ($15,000 for mechanical work.)’ Both are the city’s own words; check which applies to your scope.

Office: ‘214 North Hogan Street, Jacksonville, FL 32202’, phone ‘904-255-8500’, email ‘[email protected]’.

Online permit submission Building Inspection Division home page Residential permits page New Building – 1 & 2 Family Checklist

Source conflicts and stale pages

Not every page on the city site has been updated. The residential permits page still describes a counter process: ‘You must have two complete sets of architectural plans, site plans, truss engineering when necessary, and three sets of energy calculations and Manual J when the work involves a new space that is heated or cooled.’ That is a counter process, which conflicts with the portal-only rule above, though it also ties Manual J to a new conditioned space. The commercial page cites ‘the 1997 Energy Efficiency Code for Building Construction’. We follow the dated checklist and flag the rest.

Residential permits page Commercial permitting page

Climate zone

Not verified. None of the Jacksonville documents we read states a climate zone, so none is shown on this page.

Verified against official sources on 2026-10-12. Codes and local policies change, so confirm with the building department before you submit. Send us the address and we will check it for you.

Questions

What code does Jacksonville (Duval County) enforce?

The city says the current code in effect is the Florida Building Code 8th Edition (2023), and that documents for permits submitted on or after 1 January 2024 must reference and comply with it.

Does Jacksonville require a Manual J?

For one- and two-family new buildings, additions and accessory structures, the city checklist says to provide calculations based on ACCA Manual J, 2023, 8th Edition minimum, with Manual S equipment selection. Whether a changeout needs one is not verified.

Do I need a permit to replace an air conditioner in Jacksonville?

Yes. The city FAQ lists replacement of air conditioning units as work that needs a permit. An owner may ask to waive inspections for a replacement of existing electric one- or two-family HVAC equipment costing no more than $5,000, using a notarized city form.

How do I submit an HVAC permit in Duval County?

Through the JaxEPICS online portal, which the city says is required for all permit types. Documents must be PDF. Questions go to the Building Inspection Division at 904-255-8500.

Fast estimates

Send the plans. Get an estimate.

Send us your questionnaire and plans, and we’ll get you an estimate right away. Reach out during office hours and you’ll hear back within 30 minutes, whether it’s an email, text or call.

Fast estimate

Drop your plans. Get an estimate.

PDF or photos of the plan set. Pick your services and send.

    Services

    Reach out during office hours and you’ll hear back within 30 minutes, whether it’s an email, text or call. Have every detail handy? Fill out the full project questionnaire.

    Client Login